ECR 65 606
ECR 65 606
Eton, Buckinghamshire: Chalvey Ditch footbridge and lasher weir details
Item
1967
1 drawing
Thames Conservancy.
Improvement scheme.
Typical footbridge, elevation and plan. Provision for lashers at C.S. no.10: plan, sections.
H.C. Bowen, Chief Engineer, Thames Conservancy, plan L.D. 690/3. Scale: 2 ft. to 1 inch.
Note in ink: 2 copies to MAFF 3/66. 2 copies to SDE 26/5/66. Endorsed in pencil: Thames Conservancy. Improvement of Chalvey Ditch I967.
3' 3 3/4" x 2' 2 3/4".
Improvement scheme.
Typical footbridge, elevation and plan. Provision for lashers at C.S. no.10: plan, sections.
H.C. Bowen, Chief Engineer, Thames Conservancy, plan L.D. 690/3. Scale: 2 ft. to 1 inch.
Note in ink: 2 copies to MAFF 3/66. 2 copies to SDE 26/5/66. Endorsed in pencil: Thames Conservancy. Improvement of Chalvey Ditch I967.
3' 3 3/4" x 2' 2 3/4".
None