ECR 65 606
Reference code
ECR 65 606
Title
Eton, Buckinghamshire: Chalvey Ditch footbridge and lasher weir details
Level
Item
Date
1967
Extent & medium
1 drawing
Content description
Thames Conservancy.
Improvement scheme.
Typical footbridge, elevation and plan. Provision for lashers at C.S. no.10: plan, sections.
H.C. Bowen, Chief Engineer, Thames Conservancy, plan L.D. 690/3. Scale: 2 ft. to 1 inch.
Note in ink: 2 copies to MAFF 3/66. 2 copies to SDE 26/5/66. Endorsed in pencil: Thames Conservancy. Improvement of Chalvey Ditch I967.
3' 3 3/4" x 2' 2 3/4".
Improvement scheme.
Typical footbridge, elevation and plan. Provision for lashers at C.S. no.10: plan, sections.
H.C. Bowen, Chief Engineer, Thames Conservancy, plan L.D. 690/3. Scale: 2 ft. to 1 inch.
Note in ink: 2 copies to MAFF 3/66. 2 copies to SDE 26/5/66. Endorsed in pencil: Thames Conservancy. Improvement of Chalvey Ditch I967.
3' 3 3/4" x 2' 2 3/4".
Location of this record in the archive hierarchy
Click the hyperlinked text below for further details.
(Click here to scroll to the current record within the hierarchy)
Number 568 of 610 at this Level
Beneath this record in the archive hierarchy
None